Load Management

Unused or abandoned cables not terminated at equipment or marked for future use shall be removed. Load connection best practices for facilities are listed below:

Locking receptacles should be used for connecting the input cords of the power strips and for larger ITE. For in-rack loads using straight-blade cords, anti-pullout tie downs should be used where cords plug into the power strips.

Power distribution cables originating from different source PDUs, RPPs, electrical phases, taps off the same PDU, or electrical panels should be clearly identified as to their source, phase, and load capacity.

If permitted or required by the Rwanda Standards Board, cables from different sources may have different color jackets and connectors.

Branch circuit overload protection devices should be de-rated by a design factor of 20% (e.g., be at least
25% larger than their connected ITE load) to ensure that circuits are not operating at the edge of their
circuit breaker trip rating.